Skip to content
Bathroom renovation in Copenhagen

Bathroom renovation in Copenhagen

DNK Construction carries out bathroom renovation across Copenhagen and North Zealand. One contact coordinates tiling, plumbing and electrical work, and you get the wet-room documentation with the handover. Free quote, reply within five hours on weekdays.

12 years of experience Reply within 5 hours Greater Copenhagen Private & commercial

Get a quote for your new bathroom

By sending this you accept our privacy policy.

★★★★★AndreasTiling
Bathroom renovation with travertine tiles — Copenhagen

Complete renovation of your bathroom

Bathroom renovation requires planning and coordination of several trades. DNK Construction is your single point of contact throughout — from demolition of the old bathroom to the finished result.

We carry out bathroom renovation in Helsingør, Roskilde, Køge, Hillerød, Frederikssund and the whole of Greater Copenhagen. Projects range from a cosmetic update of your existing bathroom to a full renovation replacing all installations, tiles and fixtures.

A new bathroom must comply with strict building regulations for wet rooms. We work with authorised partners and ensure all work is correctly documented.

New shower with marble tiles — bathroom renovation Copenhagen

Bathroom renovation costs

The bathroom is the most expensive room per m² to renovate. A full renovation typically costs DKK 30,000–40,000 per m². A cosmetic update replacing only surfaces and fixtures costs DKK 5,000–8,000 per m².

Set aside 15–25% for unexpected costs — it is normal to encounter water damage or outdated plumbing that must be addressed before new work can begin. Get at least two to three quotes and ask for a fixed price before work starts.

Finished bathroom with tiled floor and walls — DNK Construction, Copenhagen

A bathroom renovation step by step

A bathroom is built in a fixed order, and each stage has to be finished before the next can start. First the old bathroom is stripped out and removed. Then comes the drainage and first-fix plumbing, followed by the electrical runs. The floor is cast and the wet-room membrane laid. Finally the tiles go on floor and walls, and the toilet, shower and basin are fitted.

The wet-room membrane is the stage that decides whether the bathroom lasts. It has to meet the Danish building regulations for wet rooms and it has to be documented. We work with authorised plumbing and electrical partners, and you receive the documentation when the job is handed over. That paperwork is what a buyer or a surveyor will ask for if you later sell the property.

Because the stages depend on each other, coordination is what keeps the timeline. You have one point of contact for the whole project instead of chasing separate trades. If only the tiles need replacing, see indoor tiling. If the bathroom is part of a larger project, we also carry out house and apartment renovation and internal demolition.

Get a quote for your new bathroom

Call +45 71 85 02 90 or send us a message. We reply within five hours on weekdays.

Frequently asked questions about bathroom renovation in Copenhagen

Yes, bathroom renovation can qualify for the Danish home improvement tax deduction (håndværkerfradrag) if the work is carried out by a company with a registered CVR number. The deduction applies to labour costs, not materials. Check the current conditions at skat.dk.

In single-family homes, bathroom renovation usually does not require planning permission unless load-bearing structures are altered or the drainage layout is changed. Drainage changes always require an authorised drain contractor.

A complete bathroom renovation typically takes two to four weeks, depending on size and complexity. Coordinating the different trades is key to keeping the schedule on track.

A full renovation typically costs DKK 30,000–40,000 per m². A cosmetic update replacing only surfaces and fixtures costs DKK 5,000–8,000 per m². Set aside 15–25% for unexpected costs such as hidden water damage or outdated plumbing.

We carry out bathroom renovation across Greater Copenhagen and North Zealand, including Helsingør, Hillerød, Frederikssund, Roskilde and Køge. If your address is outside these areas, get in touch anyway and we will tell you straight away whether we can take the job.

No. Most of the work runs without you being present, and we agree access in advance. The bathroom is out of use for the whole period, so plan for another bathroom or a temporary solution while the work is going on.

You receive documentation for the wet-room work and for the authorised plumbing and electrical work. Keep it: it is what a buyer, a surveyor or an insurer will ask for later.

Get in touch with Klidas

Phone is the fastest way to get an answer.

+45 71 85 02 90 dnkconstruction.dk@gmail.com
Rosenhøj 7, 2990 Nivå, Denmark
Covers Greater Copenhagen & North Zealand
CVR: 46088794
Reply within five hours on weekdays

Get a fixed quote within 24 hours

By sending this you accept our privacy policy.